Water Is Life

Dear visitors of our website,
Below you find some impressive pictures, showing and expressing the importance of water for human beings, animals and our environment.
Lets keep our environment clean!
With best regards from our Hydrotec team.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Small Run-Of-River Hydro


Run-of-the-river hydroelectricity (ROR) projects are dramatically different in design and appearance from conventional hydroelectric projects.

Traditional hydro dams store enormous quantities of water in reservoirs, necessitating the flooding of large tracts of land and includes environmental disruption including tree-cutting and “tunneling” which is capital intensive and takes 3-5 years for traditional hydro project build-outs.

In contrast, small run-of-river projects do not require a large impoundment of water, which is a key reason why such projects are often referred to as environmentally friendly.

Hydrotec Renewables is building small ROR hydro projects within 7-9 months with civil engineering & excavation expense at 1/3rd the cost of traditional hydro schemes delivering greater project IRRs to investors, shorter payback periods of 3-5 years thru a more eco-friendly approach that has met the approval requirements of Philippines regulatory agencies including DOE, ERC, DENR along with project site voter approvals for Hydrotec Renewables 1st project series of Dept. of Energy’s service contract awards.

Our portfolio of 38 Philippines small ROR hydro projects encompass an aggregate capacity to deliver ca. 300 MW of renewable power to both metro and rural project community consumption in the areas of Luzon and Visayas including Metro Manila and Negros.

 

Hydrotec Power Sale & Off Take Plan

 

 

Longitudinal Profile — Cascading the Marikina River by Small Hydro Power Plants. 

By cascading the Marikina River small reservoirs will be created, a water storage volume of ca. 800 Million m3 - similar to Angat reservoir - will be reached, which can contribute to a more efficient flood control and much lower sedimental inflow for the areas of Metro Manila, Pasig River, Laguna Lake and Manila Bay.

Furthermore, with the installation of hydraulic cleaning machines and trashracks at each of our small hydro plants, any solid wastes and debris will be removed from the rivers.

Hydrotec Renewables is positioned to sell power production thru several options that address range of power demand including the largest Utility and corporate power buyers.

Hydrotec’s flexibility to manage multiple market channels is designed to optimize pricing controls for special situation spot & long-term power market transactions & yield the highest premium price per Kwh average.

 

Hydrotec’s power sales are generated the following:

 

 

Philippines Feed-In Tariff

5.9 Pesos or 13 cents (US) per kWh with 20 Year Term.

 

In July 2012, the Philippines Energy Regulatory Commission (ERC) approved the following FIT rates based on the petition of the National Renewable Energy Board: Run-of-River Hydropower - 5.90 Pesos or 13 cents per kWh. 

 

As approved, eligible Renewable Energy plants will be entitled to the above mentioned FIT rates for a period of 20 Years. Inclusive is a 7 year Tax holiday, Tax exemption on Equipment imported and several other incentives.

 

Corporate Power Purchasers

 

Within the Hydrotec’s portfolio of project communities large volume corporate power buyers are in negotiations to finalize corporate power off-take agreements otherwise defined as Power Purchase Agreements. 

 

 

Wholesale Electric Spot Market

 

http://www.wesm.ph/

 

The Wholesale Electricity Spot Market (WESM) began commercial operations in Luzon in June 2006 and in the Visayas in December 2010.

 

It is a centralized venue for buyers and sellers to trade electricity as a commodity where prices are based on actual use (demand) and availability (supply).

Utility Distributors

Hydrotec has received interest from electrical cooperatives, Philippines utility distributors and corporate power buyers for power purchase agreement as Hydrotec’s project platform in overlaps their existing power distribution footprint and are always seeking reliable renewable power suppliers such as Hydrotec Renewables.

 

 

Project Partner Opportunities


Hydrotec Renewables welcomes the expressed interest of Project Equity Investors. Based on Hydrotec’s project economics we can provide competitive Project IRRs with annual dividends and payback terms that are attractive for renewable project investors.

We are pleased to provide qualified investors full transparency including Project Site surveys & visits thru our Management and can provide complete due diligence including regulatory approval documentation and project budgets to substantiate Hydrotec’s financial forecasts moving forward.









Project Communities

Hydro Power & Bulk Water Supply

In addition to renewable power production at project site, Hydrotec Renewable’s ancillary byproduct includes bulk water supply & sale.

Our high-end turbine & production systems combine filtration processes that results in potable water in high volumes for certain project communities including our Talisay project located in Negros.

Poor water quality is a serious concern within project communities and Hydrotec’s value-added contribution beyond the core focus of clean energy production also includes clean water supply that is consumable and reliable in meeting water quality standards acceptable for human consumption.

Philippines Water Quality Video :

Ecotourism

In rural communities of the Philippines the deployment of renewable energy power supply provides the foundation to start building local economies.

Hydrotec Renewables is committed to providing local employment opportunities and working with our project partners in support of local housing & commercial development plans for local communities to increase attraction for tourism that can drive commerce for project communities.

A percentage of Hydrotec’s profit will be reinvested into our project partner communities for the buildout of organic gardens, schools and parks.

Samples ecotourism plan for the Wawa small ROR hydro plant in which the World Bank has provided development funds for the project community.

More Articles...

Visit in 888bingo information.